
Four Comal County aquifer plans have comment deadlines through Nov. 9
Nearby residents have until Oct. 19, Nov. 2 or Nov. 9 to comment on four Comal County plans listed by TCEQ as under review.
2 min read · Applications under reviewThe aquifer, the rivers, the lake, drought, and weather
Edwards Aquifer and Canyon Lake levels, drought stages, water and wastewater systems, flooding, burn bans, parks and trails, and rural land.
Comal.News local reporting · Updated continuously
Nearby residents have until Oct. 19, Nov. 2 or Nov. 9 to comment on four Comal County plans listed by TCEQ as under review.
2 min read · Applications under review
NBU customers now pay $1.75 more each month in fixed water charges for a 5/8-inch meter. At 6,000 gallons, modeled water costs rose $4.18.
4 min read · Rates in effect
NBU’s planned $126 million expansion would add treatment capacity for New Braunfels customers, while a project-level financing breakdown is the next record needed to assess who pays.
3 min read · Planned expansion
New Braunfels residents at NBU-served addresses should request service at least one business day before their preferred start date. Here are the application, ID and deposit steps.
3 min read · Official service guide
Residents who comment on national forest or grassland projects face changed comment and objection procedures starting Nov. 12.
2 min read · Final rule published
Residents near New Braunfels can now review a proposed permit for treated-wastewater irrigation on 117 acres; the next documented step was an Oct. 12 preliminary hearing.
2 min read · Permit proposed; hearing scheduled
NBU customers pay no drought surcharge at the current Stage 2, but a move to Stage 3 or 4 would add conditional costs for residential use above 6,000 gallons a month.
3 min read · Plan effective; Stage 2 in effect
An engineer recommends the lowest qualified base bid for a Paul Davis Park trail. Council is scheduled to consider the contract Oct. 7; three expansion options are excluded from the recommendation.
2 min read · Council consideration scheduled
Directors are scheduled to consider a Mathis irrigation-suspension agreement, hear a proposed 2027 budget and fee rates, and receive recharge-dam and conservancy reports.
3 min read · Board consideration scheduled
An Oct. 7 hearing will take up a proposed 300-foot sewer connection rule, a conditional exemption for existing septic systems and property owners’ repair duties.
3 min read · Hearing scheduled
A wastewater hearing, nuisance rules, Water Commission appointments and a Paul Davis Park trail bid are on the Oct. 7 agenda. Residents have two chances to comment.
3 min read · Meeting preview
A proposed 2026 funding amendment would add money for professional services and research in the habitat program that includes Comal Springs.
2 min read · Proposed for Oct. 8
New Braunfels' proposed 2027 conservation budget covers river plants, invasive species and water-quality work. The Oct. 8 committee review is the next step.
2 min read · Proposed for Oct. 8 review
New Braunfels and Comal County activated emergency operations and pre-staged barricades as a flood watch began, with isolated rainfall totals up to 8 inches possible.
2 min read · Flood watch in effect
Residents who use County Line Memorial Trail could get a wider path, rebuilt exercise stations and improved crossings if New Braunfels wins the grant.
2 min read · Verified council action
A council vote moves roughly 130 acres near Hunter Road toward public trail access, with New Braunfels responsible for construction, maintenance, utilities, insurance and improvements.
2 min read · Verified council action
New Braunfels approved the TxDOT funding agreement for an off-road trail between Gruene Road and FM 306, carrying an estimated $728,600 city share.
2 min read · Council approved
A council vote clears the TxDOT agreement for a shared-use path from Gruene Road to FM 306, with New Braunfels carrying an estimated $728,600 share and all overruns.
2 min read · Verified council action
A final-reading proposal would simplify drought stages and move the strictest sprinkler schedule to every other week.
3 min read · Final vote scheduled
A citywide code proposal would define acceptable parking surfaces, create a sidewalk escrow option and expand drainage documentation for some home permits.
2 min read · Proposal for Sept. 30 workshop
A draft resolution would start the notice process for county debt backed by property taxes and solid-waste revenue, with a tentative authorization vote Nov. 19.
2 min read · Proposal posted
Schertz annexed and rezoned 10.7 city-owned acres near FM 482 for a future nature park after planning records documented flooding, traffic and maintenance concerns.
2 min read · Verified council action
A Sept. 28 vote would move the trail from a 2025 TxDOT award into a funding agreement that assigns the local share and every overrun to New Braunfels.
2 min read · Vote scheduled Sept. 28
The city would seek a $4 million grant and provide an equal local match for a conceptual rebuild of the 2.2-mile trail.
2 min read · Council vote scheduled
A unanimous EDC vote moves proposed public trail access on roughly 130 northwest New Braunfels acres to City Council for a Sept. 28 decision.
1 min read · Council action pending
The regional water authority proposes a higher groundwater fee, reserve spending and $851,029 for Comal Springs work.
2 min read · Verified proposal
Commissioners accepted the Vogel Dam improvements and released the surety after engineering and conservation-district reviews.
2 min read · Verified action
The Villa Rio property association now faces negotiations backed by condemnation authority for a permanent NBU utility easement at 470 Rio Drive.
2 min read · Verified council action
Schertz is paying about $200,000 annually toward a second water organization whose stand-alone project carried a $162 million estimate in 2021. Council will examine the arrangement Tuesday.
2 min read · Workshop scheduled
Schertz council could adopt utility and drainage increases Sept. 15 as part of the fiscal 2027 budget.
1 min read · Proposed; council hearing Sept. 15
A proposed five-year lease would let New Braunfels manage EDC-owned land for primitive trail access while assuming maintenance and operating costs.
2 min read · Vote scheduled Sept. 15
Dietz Elkhorn water-line construction started this month, while Fair Oaks Ranch expects its Plant 5 storage tank project to finish Sept. 18.
3 min read · Agenda posted
A Sept. 14 vote could give NBU condemnation authority over a 0.7402-acre Villa Rio easement needed for sewer-system work.
1 min read · Proposed for Sept. 14
Champions Village residents can hear what sewer work NBU has completed and question utility staff about the neighborhood’s future wastewater needs Wednesday evening.
1 min read · Forum scheduled Sept. 9
The flood-control estimate rose from $4.3 million to $12.4 million as 33 Road and Bridge vacancies delayed routine work, archived county minutes show.
3 min read · Archive verified
By Aug. 31, D&D had completed preconstruction steps for Dietz Elkhorn and Fair Oaks Ranch had filed its tank-grant application; the July 2 package supplies the price, scope and utility-budget baseline.
2 min read · Archived records verifiedCounty Watch separates scheduled decisions, active changes, and unresolved questions.