Open site navigation
Explore Comal.News
Send a tip

The Comal Daily

Comal County, before your second cup.

Comal County news every morning, with links to the original sources.

By subscribing, you agree to receive The Comal Daily and to our Terms and Privacy Policy. Unsubscribe anytime.

The Comal Daily

Comal County, before your second cup.

Comal County news every morning, with links to the original sources.

By subscribing, you agree to receive The Comal Daily and to our Terms and Privacy Policy. Unsubscribe anytime.
Send a tip

The Comal Daily

Comal County, before your second cup.

Comal County news every morning, with links to the original sources.

By subscribing, you agree to receive The Comal Daily and to our Terms and Privacy Policy. Unsubscribe anytime.
Comal County, TexasUpdated throughout the day
Local intelligence for a fast-growing county
Send a tip

The Comal Daily

Comal County, before your second cup.

Comal County news every morning, with links to the original sources.

By subscribing, you agree to receive The Comal Daily and to our Terms and Privacy Policy. Unsubscribe anytime.
Comal County news deskLocal reporting, every day

Comal County septic permits: how to apply and schedule inspections

For residents in unincorporated Comal County: follow the nine-step septic permit process and give the county at least 24 hours’ notice before an inspection.

A blank lined form sits beside a soil sampler, layered soil sample, rolled plan, leafy branch and three orange markers.
Illustration: Septic permit planning materials, a soil sample and inspection markers.Original editorial illustration; not a photograph and does not depict the reported event or an exact property.Comal.News Visual Desk · Original illustration · Source ↗ · Comal.News original illustration ↗

Before building, altering, extending or operating an on-site sewage facility in unincorporated Comal County, get a permit and approved plans from Comal County Environmental Health.

An on-site sewage facility, or OSSF, is the county’s term for a system that treats wastewater on the property. The county’s Environmental Health Department reviews designs and issues OSSF permits; its published permit guide lays out nine steps from the first site evaluation to permission to use the finished system.

Residents in unincorporated Comal County must obtain authorization before construction, arrange three inspections during installation and receive a license to operate before using the system. That sequence matters if you are planning a new system or changes to one you already have: submitting an application does not itself authorize construction, and finishing construction does not itself authorize use.

Start with the site, then apply

The first step is an evaluation by a qualified site evaluator. That person reports on soil conditions, surveys the site and identifies structures that must be separated from an on-site system. The site and soil findings guide the choice of treatment and land application components. Planning materials must then be prepared by someone authorized under the applicable rules; the county guide describes circumstances in which a registered professional engineer or registered sanitarian is required. Ask the permitting office which planning requirements apply to your lot and proposed system before paying for a design.

The application and planning materials must be submitted in the property owner’s name on a form provided by the permitting authority. The county’s Environmental Health page links the OSSF permit application, an online permit portal and its current fee schedule. Check that schedule for the fee that applies to your application; the three pages used for this guide do not establish an application-fee amount.

Comal County’s nine published steps for obtaining an OSSF permit
StepWhat happens
1A qualified evaluator examines the site and soil.
2Choose a treatment and land application system suited to the site.
3Have the system plan prepared by an authorized person.
4Submit the owner’s application and planning materials.
5The permitting authority reviews the submission.
6Receive authorization to construct before building.
7Build according to the approved plans; get approval before changes.
8Schedule and complete inspections during construction.
9Receive approval or a license to operate after inspections pass.

Condensed from the county’s published permit guide; the guide gives additional requirements for particular sites and systems.

Construction and inspections

The permitting authority reviews the application, evaluation, proposed system and supporting documents before deciding whether to issue authorization to construct. That authorization should specify how many inspections are needed and when they must occur. Licensed installers or their apprentices may begin work only after authorization, and changes to the approved system require the permitting authority’s approval before they are made. If site conditions differ from the submitted plans, a new review may be needed.

The county says three inspections are required as the system is installed. Notify its office at least one day, or 24 hours, before an inspection is needed. If a system fails an inspection or is not ready when the designated representative arrives, the installer is responsible for a $150 reinspection fee. The county says these inspection requirements also apply to systems needing alteration or repair. After the required inspections and approval, the applicant receives a license to operate; obtain it before putting the system into use.

Repairs, city limits and where to ask

County guidance says a permit is required before non-emergency repairs. It describes a limited exception for an emergency repair that abates an immediate, serious and dangerous health hazard and does not alter the system’s planning materials or function. An alteration requires a new OSSF permit. If you are dealing with a failing system, consult Environmental Health about the proposed repair before relying on that exception. The county also says homeowners are responsible for conducting or arranging system maintenance.

This guide covers property in unincorporated Comal County. The Environmental Health page lists agreements with several cities; if your property is inside city limits, confirm which authority handles its OSSF permit before applying. To get started, use the application and fee-schedule links on the county’s Environmental Health page, or contact the Engineer’s Office at 195 David Jonas Drive, New Braunfels, TX 78132, 830-608-2090. The page lists office hours as Monday through Friday, 8 a.m. to 4:30 p.m. Bring the property location and your proposed work when asking which application, plans and fees apply.

From the source record

County permit guideSteps to Obtain an OSSF Permit
“The permitting process is composed of nine steps that need to be followed when installing an on-site system.”
Comal County ↗
Comal County’s published sequence covers site evaluation, application, construction, inspections and approval.

Related coverage

The Comal Daily

Comal County, before your second cup.

A clear morning briefing, with direct links to the records and sources behind each story.

By subscribing, you agree to receive The Comal Daily and to our Terms and Privacy Policy. Unsubscribe anytime.