New Braunfels has drafted rules that would require data centers in industrial districts to obtain a Type 2 special use permit and meet new setback and resource documentation standards.
The draft's 500-foot setback would affect residents near potential data center sites if adopted. The proposed distance applies to residential and specified sensitive uses; a separate 50-foot setback would apply to other districts or uses. The proposal also calls for a 50-foot landscaped buffer and a 55-decibel maximum at sensitive property lines.
From the source record
The draft calls for a Type 2 special use permit in specified industrial districts and a 500-foot setback from residential and specified sensitive uses.City of New Braunfels ↗
A permit before construction
The document is draft code language attached to the Oct. 19 special City Council meeting. It would allow data centers, including cryptocurrency mining facilities, through a Type 2 special use permit in the M-1, M-1A, M-2 and M-2A industrial districts. Under the draft, council approval of that permit would precede a building permit. These are proposed standards, not an adopted rule.
An applicant would have to submit projected daily water use, cooling and conservation information, generator details, utility approval letters addressing demand and capacity, a phased site plan, elevations, a traffic impact analysis and a noise study by a qualified professional. Those requirements would give council information about service demand and nearby impacts when reviewing a permit application.
Water, site and operating limits
The draft would require closed-loop or similar water-saving cooling. It would prohibit data centers in the regulatory floodway, the 1% annual-chance floodplain and the Edwards Aquifer Recharge and Contributing zones. Other provisions address equipment screening, an emergency plan, parking and cleanup after a facility closes. Each provision remains part of a proposal for council review.
What happens next
The special City Council meeting is listed for 5 p.m. Oct. 19 in City Hall Council Chambers. The data center proposal is scheduled as a workshop briefing on a potential code amendment; the draft itself does not establish an adoption. Readers can inspect the draft code language to see the proposed standards before the workshop. The next official record to check is the workshop record or a subsequent posted ordinance or hearing agenda, which could show whether council directed changes or scheduled a decision.
