Open site navigation
Explore Comal.News
Send a tip

The Comal Daily

Comal County, before your second cup.

Comal County news every morning, with links to the original sources.

By subscribing, you agree to receive The Comal Daily and to our Terms and Privacy Policy. Unsubscribe anytime.

The Comal Daily

Comal County, before your second cup.

Comal County news every morning, with links to the original sources.

By subscribing, you agree to receive The Comal Daily and to our Terms and Privacy Policy. Unsubscribe anytime.
Send a tip

The Comal Daily

Comal County, before your second cup.

Comal County news every morning, with links to the original sources.

By subscribing, you agree to receive The Comal Daily and to our Terms and Privacy Policy. Unsubscribe anytime.
Comal County, TexasUpdated throughout the day
Local intelligence for a fast-growing county
Send a tip

The Comal Daily

Comal County, before your second cup.

Comal County news every morning, with links to the original sources.

By subscribing, you agree to receive The Comal Daily and to our Terms and Privacy Policy. Unsubscribe anytime.
Comal County news deskLocal reporting, every day

New Braunfels draft would require permits and setbacks for data centers

A draft would add permit, setback, noise and utility requirements for data centers, affecting residents near potential sites. Council's next step is an Oct. 19 workshop.

Listen to this articleComal.News narrated edition
Ready · 0:00 / 2:41
Blue and cream illustration of houses, shrubs and open land, with dashed outlines of large industrial buildings in the distance.
Illustration: Homes and open land near the outline of a proposed data center, representing potential setbacks rather than an actual site.Original editorial illustration; not a photograph and does not depict the reported event or an exact property.Comal.News Visual Desk · Original illustration · Source ↗ · Comal.News original illustration ↗

New Braunfels has drafted rules that would require data centers in industrial districts to obtain a Type 2 special use permit and meet new setback and resource documentation standards.

The draft's 500-foot setback would affect residents near potential data center sites if adopted. The proposed distance applies to residential and specified sensitive uses; a separate 50-foot setback would apply to other districts or uses. The proposal also calls for a 50-foot landscaped buffer and a 55-decibel maximum at sensitive property lines.

A permit before construction

The document is draft code language attached to the Oct. 19 special City Council meeting. It would allow data centers, including cryptocurrency mining facilities, through a Type 2 special use permit in the M-1, M-1A, M-2 and M-2A industrial districts. Under the draft, council approval of that permit would precede a building permit. These are proposed standards, not an adopted rule.

An applicant would have to submit projected daily water use, cooling and conservation information, generator details, utility approval letters addressing demand and capacity, a phased site plan, elevations, a traffic impact analysis and a noise study by a qualified professional. Those requirements would give council information about service demand and nearby impacts when reviewing a permit application.

Water, site and operating limits

The draft would require closed-loop or similar water-saving cooling. It would prohibit data centers in the regulatory floodway, the 1% annual-chance floodplain and the Edwards Aquifer Recharge and Contributing zones. Other provisions address equipment screening, an emergency plan, parking and cleanup after a facility closes. Each provision remains part of a proposal for council review.

What happens next

The special City Council meeting is listed for 5 p.m. Oct. 19 in City Hall Council Chambers. The data center proposal is scheduled as a workshop briefing on a potential code amendment; the draft itself does not establish an adoption. Readers can inspect the draft code language to see the proposed standards before the workshop. The next official record to check is the workshop record or a subsequent posted ordinance or hearing agenda, which could show whether council directed changes or scheduled a decision.

From the source record

Proposed codeDraft data center standards
The draft calls for a Type 2 special use permit in specified industrial districts and a 500-foot setback from residential and specified sensitive uses.
City of New Braunfels ↗
Draft code language attached to the Oct. 19 special City Council meeting.

The Comal Daily

Comal County, before your second cup.

A clear morning briefing, with direct links to the records and sources behind each story.

By subscribing, you agree to receive The Comal Daily and to our Terms and Privacy Policy. Unsubscribe anytime.