NBU plans $7.76 million to enlarge two Blieders Creek sewer mains, while the adopted FY2027 amount covers only $449,978.
NBU schedules $3.79 million in FY2028 and $3.53 million in FY2029, both forecast amounts. Only the FY2027 allocation is appropriated; later years require annual review and board action.
Where and when
Each number on the map matches the list below. Tap a number for its times and source.
Loading map…
Map data © OpenStreetMap contributors. Use two fingers to move the map on a phone.
- Site
Blieders Creek
Planned replacement of a 12-inch main with a 15-inch main.
Also (not on the map)
- Site
Steerhead Trail sewer main
Steerhead Trail
Planned replacement of a 15-inch main with an 18-inch main.
What the project would change
The project would replace a 15-inch main near Steerhead Trail with an 18-inch main and a 12-inch main along Blieders Creek with a 15-inch main.
NBU places the work in its wastewater category for interceptor capacity and growth. That tells readers why the utility put larger pipes in its capital plan. The next useful test is the flow study behind those sizes: it could show how much capacity is intended for existing use and how much for future connections.
Where the project money goes
The planned cost covers contract labor, engineering, overhead, internal labor and land or easements. Contract labor is the largest category in the table below. These are capital-plan amounts, not construction bids or contract awards.